Fall came and is now gone, and  we shoot everything we could on that time. We didn't get to shoot all  the material which was described in the script, but I think it is good.  The materials which we shooted had some great footage, and some of it  can be transferred straight into the new project. But some footage was  not that good, and some of them were terrible. One aspect, which  degraded every footages quality was the missing DOF adapter. You can't  really get that movie look and feeling, when the footage has no depth of  field. And the snowy landscapes does not work with the colors of 300,  which are mainly brown. The blue color world shown some parts in the  movie 300 works well with snow, but thats a raw fact that the brown  color world is what is dominant in the film. Looking at these aspects,  we decided to start the project again, from a fresh start. We improve  our equipment, in terms of actor's equipment and shooting equipment and  editing equipment. And also goal is to improve our acting. The acting  was not bad, but of course it could be better. More angry and more  blood-thirsty. And we change and improve some of the choerographies, and  find a better looking spots for our scenes. The overall improvement  progress has started well, for we have the 35mm adapter and lens for our  camera, and we have more powerful editing machine. Our director has  started to train his skills in operating the camera, and as a new aspect  he has started to learn the cutting and merging the scenes fluidly and  with professional touch. We are planning to shoot the film during the  summer, however some of us are in the army, but in the weekend holidays  and in possible 9-day holidays. Starting to look good.
02/27/2010
No comments:
Post a Comment